Publications (12)
High power density test of PXIE MEBT absorber prototype
A. Shemyakin, C. Baffes
One of the goals of the PXIE program at Fermilab is to demonstrate the capability to form an arbitrary bunch pattern from an initially CW 162.5 MHz H- bunch train coming out of an…
The Use of KF Style Flanges In Low Particulate Applications
K. R. Kendziora, J. Angelo, C. Baffes +2
As SCRF particle accelerator technology advances the need for "low particulate" and "particle free" vacuum systems becomes greater and greater. In the course of the operation of th…
Status of the warm front end of PXIE
A. Shemyakin, M. Alvarez, R. Andrews +10
A CW-compatible, pulsed H- superconducting linac is envisaged as a possible path for upgrading Fermilab's injection complex. To validate the concept of the front- end of such a mac…
Design of MEBT for the Project X Injector Experiment at Fermilab
A. Shemyakin, C. Baffes, A. Chen +16
The Project X Injector Experiment (PXIE), a test bed for the Project X front end, will be completed at Fermilab at FY12-16. One of the challenging goals of PXIE is demonstration of…
Test Results of PIP2IT MEBT Vacuum Protection System
A. Chen, R. Andrews, C. Baffes +4
The central part of PIP-II program of upgrades pro-posed for the Fermilab injection complex is an 800 MeV, 2 mA, CW-compatible SRF linac. Acceleration in super-conducting cavities…
Status of the warm front end of PIP-II injector test
A. Shemyakin, M. Alvarez, R. Andrews +15
The Proton Improvement Plan II (PIP-II) at Fermilab is a program of upgrades to the injection complex. At its core is the design and construction of a CW compatible, pulsed H- SRF…
Preliminary Modeling Of Radiation Levels At The Fermilab PIP-II Linac
L. Lari, F. Cerutti, L. S. Esposito +5
PIP-II is the Fermilab's flagship project for providing powerful, high-intensity proton beams to the laboratory's experiments. The heart of PIP-II is an 800-MeV superconducting lin…
Commissioning And First Results From The Fermilab Cryomodule Test Stand
E. R. Harms, M. Awida, C. Baffes +34
A new test stand dedicated to Superconducting Radiofrequency (SRF) cryomodule testing, CMTS1, has been commissioned and is now in operation at Fermilab. The first device to be cool…
Mechanical Design of a High Energy Beam Absorber for the Advanced Superconducting Test Accelerator (ASTA) at Fermilab
C. Baffes, M. Church, J. Leibfritz +2
A high energy beam absorber has been built for the Advanced Superconducting Test Accelerator (ASTA) at Fermilab. In the facility's initial configuration, an electron beam will be a…
Commissioning and Operation of FAST Electron Linac at Fermilab
A. Romanov, C. Baffes, D. R. Broemmelsiek +17
We report results of the beam commissioning and first operation of the 1.3 GHz superconducting RF electron linear accelerator at Fermilab Accelerator Science and Technology (FAST)…
PIP-II Injector Test Warm Front End: Commissioning Update
L. Prost, R. Andrews, C. Baffes +19
The Warm Front End (WFE) of the Proton Improvement Plan II Injector Test at Fermilab has been constructed to its full length. It includes a 15-mA DC, 30-keV H- ion source, a 2 m-lo…
Installation Progress At The PIP-II Injector Test At Fermilab
C. Baffes, M. Alvarez, R. Andrews +14
A CW-compatible, pulsed H- superconducting linac "PIP-II" is being planned to upgrade Fermilab's injection complex. To validate the front-end concept, a test accelerator (The PIP-I…